From challenge to handover
-
The challenge
A headquarters building in Al-Ghadeer whose floors, water tanks and expansion joints had to be treated to the approved quality requirements.
-
The engineering solution
Three scopes of work:
- Epoxy floors with traffic lanes
- Epoxy water-tank linings
- Expansion-joint treatment
-
The result
The project was completed and fully handed over in January 2026, covering more than 14,800 m² (approx.).