Site QA/QC checklists

Checks before, during and after the works for each system family: surface acceptance, moisture, corners, primer, thickness, laps, terminations, protection and the flood test.

12checklists
157checks
44hold points

How to use the checklists

  1. Each system family has one checklist in three stages: before, during and after the works.
  2. A hold point ◆ means the next stage does not start before inspection and sign-off.
  3. Each item gives a method and an acceptance criterion in general terms; the actual values come from the approved specification, the product TDS and the inspection and test plan (ITP).
  4. The printed copy is a site form: inspection details at the top, a remarks column and space for signatures.

Quality on site

Need an inspection or QA/QC support on your project?

Tell us the system and the stage of the works; our engineers arrange an inspection visit or a review of the inspection plan.

Ask Prime Shield Engineer

Connecting…

The assistant’s answers are guidance based on Prime Shield’s published content; the final technical decision follows a review by a Prime Shield engineer.

Call us+966 59 240 0524 E-mail uscontact@primeshield.com.sa