From challenge to handover
-
The challenge
A compound of 69 villas where Prime Shield holds every waterproofing and thermal insulation item — the same quality is needed in every villa.
-
The engineering solution
Three work packages:
- Roofs: foam-concrete screed, sprayed PU foam and a final protection layer
- Bathrooms and kitchens: wet-area waterproofing with corner and penetration details
- Tanks: external and internal systems suitable for potable water
-
The result
The project is ongoing, with more than 32,500 m² of total works.