▽ +09.00Technical detail · PS-D-01
Roof parapet
The membrane turned up the parapet over a fillet, terminated with a fixed bar and sealant under a metal counter-flashing.
+01.00PS-D-01
Section and numbered callouts
Callouts
- 1Coping falling towards the roof, with dripsغطاء الدروة بميل نحو السطح مع مقطر
- 2Metal counter-flashing in a sealed chaseوزرة معدنية (فلاشنج) مثبتة في مجرى مختوم
- 3Termination bar, mechanically fixed and sealedشريط إنهاء مثبت ميكانيكيًا مع مانع تسرب
- 4Protection board to the upstandلوح حماية للجزء المرفوع من الغشاء
- 5Waterproofing membrane turned up the parapetغشاء العزل المائي مرفوعًا على الدروة
- 6Mortar fillet at the internal angleحشوة زاوية (فيليه) من المونة
- 7Reinforced concrete slab and parapetالبلاطة والدروة الخرسانية
- 8Perimeter joint: sealant over a backer rodفاصل حركة محيطي: مانع تسرب فوق حبل حشو
- 9Tiles on bedding mortarبلاط على فرشة مونة
- 10Geotextile separation layerطبقة فصل من الجيوتكستايل
- 11XPS insulation boardsألواح عزل حراري XPS
- 12Waterproofing membrane on the roofغشاء العزل على السطح
- 13Primerبرايمر
- 14Foam-concrete screed to fallsصبة ميول من الخرسانة الرغوية
+02.00About this detail
What this detail solves
The roof-to-parapet junction collects water and takes the most movement, so a mortar fillet is formed in the angle and the membrane is turned up the inner face of the parapet to a height above the finished roof level. Its top edge is fixed mechanically with a termination bar and sealed, then protected by a metal counter-flashing set in a sealed chase; a coping falling towards the roof caps the parapet. The drawing shows an inverted roof: XPS boards over the membrane, a separation layer and tiles on bedding mortar, with a perimeter movement joint at the parapet.
Critical points
- The upstand height h is measured above the finished roof level, after insulation and finishes; its value follows the approved specification.
- Form the fillet and finish the angle before priming; never bridge a square corner with the membrane.
- Reinforce angles and upstands before the field membrane — see PS-D-02.
- Fix the termination bar at the centres the manufacturer recommends and seal its top edge with a compatible sealant.
- Flood-test and record before the insulation and finishes go on.
- Leave a perimeter movement joint between the finishes and the parapet, sealed over a backer rod.
Notation in this drawing
- hupstand / termination height, per specification
- FFLfinished floor level
- FALLdirection of the falls
- NTSnot to scale
+03.00Downloads
Detail files
- Download
Detail sheet — PDF (A3 landscape, Arabic & English)
Typical detailAR · ENR02026-10-08323 KB
- Request the file
DWG file (CAD)
Available on request, for the system approved on your project.
- Request the file
BIM object
Available on request, for the system approved on your project.
Technical review
Need this detail on your project?
Send your drawings, penetrations and joints; our technical team reviews them and proposes the right detail for the approved system.