Every pour ends somewhere. The joint between two pours is a plane of weakness that water finds first — in basements, tanks and slabs — unless it is planned, prepared and sealed.
03minutes read
- Topic
- Joints
- Sections
- 06
- References
- 02
- Published
- Publisher
- Prime Shield — engineering content
What a construction joint is
A construction joint is where one pour stops and the next begins: wall to raft at the kicker, wall to wall, slab to slab. Unlike an expansion joint, it is not designed to move, but it is a cold joint where new concrete meets hardened concrete — and the bond and compaction there are rarely as good as in the body of the pour.
Why they leak
- Laitance and dirt on the first pour, so the second does not bond.
- Poor compaction at the joint, and honeycombing at the base of walls.
- A waterstop that moved, is not continuous, or is not joined at corners.
- Shrinkage and early cracking along the joint line.
- Pipe sleeves and ties crossing the joint without detailing.
Ways to seal a construction joint
- Embedded waterstops
- PVC or rubber profiles cast across the joint, centre-placed or on the outer face. Continuity at junctions is essential: welded or prefabricated intersections.
- Swelling strips
- Strips that swell on contact with water, fixed to the first pour; they need the right position, enough cover and protection from early wetting, per the manufacturer.
- Injection hoses
- Perforated hoses fixed at the joint before the pour; resin can be injected through them later if the joint leaks.
- Crystalline treatment
- A crystalline slurry on the prepared joint face before the next pour, depending on the product.
- External membrane strip
- A strip of the waterproofing membrane over the joint on the positive side, as part of the external system.
Preparing the joint
- Plan the joint positions with the designer — not wherever the concrete runs out.
- Remove laitance and expose the aggregate on the hardened face: water jetting, mechanical scabbling, or a surface retarder on fresh concrete.
- Clean, then wet or treat the surface as specified.
- Fix the waterstop or hose firmly in position and check its continuity.
- Compact well at the joint during the next pour.
When a joint already leaks
In finished structures, a leaking joint is traced and then injected: polyurethane resins to stop water — expanding types for active flow — and epoxy where a structural bond is needed and the joint is dry enough. Injection hoses, where installed, make this simpler. A negative-side system or a joint detail may follow.
Construction joint or movement joint?
If a joint must open and close with temperature or settlement, it is a movement (expansion) joint and needs a system that tolerates movement — sealants, tapes or profiles — not a rigid seal.
References
Standards and guides on the subject — named to show what they cover, not to claim that any product complies.
- ACI 224.3RReport on joints in concrete construction: types, design and execution.
- BS 8102Joints and continuity in the protection of below-ground structures.
General educational content; final values and requirements follow the manufacturer’s TDS and the approved project specification.