▽ +09.00Technical detail · PS-D-07

Construction joint at a wall kicker

A cold joint between the base and a basement or tank wall: roughened surface, a cast-in waterstop where specified, and a crystalline-treated chase along the joint.

+01.00PS-D-07

Section and numbered callouts

PS-D-07 Construction joint at a wall kicker — typical section1. Wall (second pour) · 2. Reinforcement continuous through the joint · 3. Cast-in waterstop where specified · 4. Construction joint: roughened, clean surface · 5. Kicker cast with the base · 6. Base slab or raft · 7. Water-pressure side · 8. Crystalline slurry coats above and below the joint · 9. Crystalline mortar packed into the chase · 10. Crystalline slurry in the chase · 11. Chase along the jointGWLFFLk123456789101107PS-DNTS
PS-D-07SectionNTSR0 · 2026-10-08Typical detail — not for construction

Callouts

  1. 1Wall (second pour)الجدار (الصبة الثانية)
  2. 2Reinforcement continuous through the jointحديد التسليح مستمر عبر الفاصل
  3. 3Cast-in waterstop where specifiedمانع مياه مدفون حيث تنص المواصفة
  4. 4Construction joint: roughened, clean surfaceفاصل الصب: سطح مُخشّن ونظيف
  5. 5Kicker cast with the baseكيكر مصبوب مع القاعدة
  6. 6Base slab or raftالقاعدة أو اللبشة الخرسانية
  7. 7Water-pressure sideجهة ضغط الماء
  8. 8Crystalline slurry coats above and below the jointطبقات بلورية فوق الفاصل وتحته
  9. 9Crystalline mortar packed into the chaseمونة العزل البلوري تملأ المجرى
  10. 10Crystalline slurry in the chaseطبقة بلورية داخل المجرى
  11. 11Chase along the jointمجرى على امتداد الفاصل

Technical review

Need this detail on your project?

Send your drawings, penetrations and joints; our technical team reviews them and proposes the right detail for the approved system.

Ask Prime Shield Engineer

Connecting…

The assistant’s answers are guidance based on Prime Shield’s published content; the final technical decision follows a review by a Prime Shield engineer.

Call us+966 59 240 0524 E-mail uscontact@primeshield.com.sa