▽ +09.00Technical detail · PS-D-09

Basement wall

External basement wall tanking: membrane on primer, protection board, drainage composite with filter, perimeter drain, and the membrane terminated above ground.

+01.00PS-D-09

Section and numbered callouts

PS-D-09 Basement wall — typical section1. Protection over the top edge (flashing or plinth) · 2. Termination bar and sealant above ground level · 3. Concrete basement wall · 4. Primer · 5. Membrane on the water side · 6. Protection board · 7. Drainage composite with filter geotextile · 8. Backfill compacted in layers · 9. Perforated perimeter drain in geotextile-wrapped gravel · 10. Lap with the foundation membrane — see PS-D-08 · 11. Basement slabFGLGWLFGL + h124567891031109PS-DNTS
PS-D-09SectionNTSR0 · 2026-10-08Typical detail — not for construction

Callouts

  1. 1Protection over the top edge (flashing or plinth)حماية الطرف العلوي (وزرة معدنية أو لياسة)
  2. 2Termination bar and sealant above ground levelشريط إنهاء ومانع تسرب فوق منسوب الأرض
  3. 3Concrete basement wallجدار القبو الخرساني
  4. 4Primerبرايمر
  5. 5Membrane on the water sideغشاء العزل من جهة الماء
  6. 6Protection boardلوح حماية
  7. 7Drainage composite with filter geotextileلوح تصريف بفلتر جيوتكستايل
  8. 8Backfill compacted in layersردم مدكوك على طبقات
  9. 9Perforated perimeter drain in geotextile-wrapped gravelمصرف محيطي مثقب في حصى ملفوف بجيوتكستايل
  10. 10Lap with the foundation membrane — see PS-D-08تراكب مع غشاء الأساس — انظر PS-D-08
  11. 11Basement slabبلاطة القبو

Technical review

Need this detail on your project?

Send your drawings, penetrations and joints; our technical team reviews them and proposes the right detail for the approved system.

Ask Prime Shield Engineer

Connecting…

The assistant’s answers are guidance based on Prime Shield’s published content; the final technical decision follows a review by a Prime Shield engineer.

Call us+966 59 240 0524 E-mail uscontact@primeshield.com.sa