▽ +09.00Technical detail · PS-D-12

Swimming pool: wall, floor and edge

Pool edge and corner: two-coat cementitious waterproofing with corner reinforcement under the tiles, carried over the wall head and under the deck.

+01.00PS-D-12

Section and numbered callouts

PS-D-12 Swimming pool: wall, floor and edge — typical section1. Deck paving falling away from the pool · 2. Coping stone on bedding · 3. Waterproofing carried over the wall head, under the deck bedding · 4. Ground around the pool · 5. Concrete pool shell · 6. Levelling render where needed · 7. Two coats of flexible cementitious waterproofing · 8. Flexible tile adhesive · 9. Pool tiles and grout · 10. Fillet and reinforcing strip at the corner · 11. Movement joint in the tiling at the cornerWLFALL123456789101112PS-DNTS
PS-D-12SectionNTSR0 · 2026-10-08Typical detail — not for construction

Callouts

  1. 1Deck paving falling away from the poolالممشى بميل بعيدًا عن المسبح
  2. 2Coping stone on beddingحجر حافة المسبح على فرشة مونة
  3. 3Waterproofing carried over the wall head, under the deck beddingالعزل ممتد فوق رأس الجدار وتحت فرشة الممشى
  4. 4Ground around the poolالتربة حول المسبح
  5. 5Concrete pool shellهيكل المسبح الخرساني
  6. 6Levelling render where neededلياسة تسوية حيث يلزم
  7. 7Two coats of flexible cementitious waterproofingعزل إسمنتي مرن بطبقتين
  8. 8Flexible tile adhesiveلاصق بلاط مرن
  9. 9Pool tiles and groutبلاط المسبح ومونة الترويب
  10. 10Fillet and reinforcing strip at the cornerفيليه وشريط تقوية عند الزاوية
  11. 11Movement joint in the tiling at the cornerفاصل حركة في البلاط عند الزاوية

Technical review

Need this detail on your project?

Send your drawings, penetrations and joints; our technical team reviews them and proposes the right detail for the approved system.

Ask Prime Shield Engineer

Connecting…

The assistant’s answers are guidance based on Prime Shield’s published content; the final technical decision follows a review by a Prime Shield engineer.

Call us+966 59 240 0524 E-mail uscontact@primeshield.com.sa