SBS-modified bitumen
A thermoplastic elastomer: rubber-like stretch and recovery, also when cool.
- Top surface: mineral granules or film
- Upper SBS compound
- Carrier: polyester or glass fibre
- Lower SBS compound
- Burn-off underside film
01
Solutions
Waterproofing, insulation and building-protection systems, organised by where they are applied or by technology.
SolutionsBy application
By technology
Sheet membranes
Liquid-applied & linings
Cementitious & crystalline
Injection
Joint systems
Thermal insulation
Concrete repair & protection
Flooring
Falls, drainage & protection
Thermal · concrete · flooring
02
Contracting
General contracting, execution and project delivery — from planning to handover.
ContractingCapabilities
Specialist services
Categories
06
Engineering Hub
Technical tools and references: system finder, calculators, details and the library.
Engineering HubEngineering tools
▽ +09.00Comparison
Both are torch-applied modified-bitumen rolls. The difference is the polymer that modifies the bitumen — and that sets how the membrane behaves with heat and movement.
SBS
A thermoplastic elastomer: rubber-like stretch and recovery, also when cool.
APP
A plastomer: a stiffer compound with a higher softening point that copes with heat and UV.
The roll is built the same way in both: only the polymer in the compound changes. Illustrative drawing, not to scale.
Bitumen on its own turns brittle when cold and soft when hot, so it is modified with a polymer. SBS (styrene-butadiene-styrene) is a thermoplastic elastomer that gives the membrane stretch and recovery; APP (atactic polypropylene) is a plastomer that raises the compound’s softening point and makes it stiffer.
The carrier (polyester or glass fibre), the surface finish, the thickness and the number of layers are chosen separately from the polymer. Choosing SBS or APP is one decision among several that the specification and the product TDS settle.
Descriptive criteria, not scores: each cell states the usual behaviour; final values follow the product TDS and the approved specification.
| Criterion | SBSSBS-modified bitumen | APPAPP-modified bitumen |
|---|---|---|
| What it is | Bitumen modified with an elastomer (rubber-like polymer). | Bitumen modified with a plastomer (plastic-like polymer). |
| Behaviour with heat | A lower softening point than APP; stays flexible as temperatures drop. | A higher softening point; keeps its body on hot roof surfaces. |
| UV exposure | Needs a protected surface (mineral granules or a coating) if left exposed. | Copes better with UV and heat; still needs a surface made for exposure, by product. |
| Movement capability | Stretches and recovers; better over substrates with thermal or structural movement. | Stiffer, with less elongation; better suited to stable concrete decks. |
| Installation method | Usually torch-applied; some products are made for cold adhesive or hot bitumen. | Almost always torch-applied. |
| Detailing | Folds easily at corners and upstands. | Needs careful heating at folds because it is stiffer. |
| Typical applications | Roofs, basements and foundations — especially where movement is expected. | Roofs exposed to sun and heat, and stable decks. |
| Protection requirement | Under tiles or backfill: a protection board or screed. Exposed: a cap sheet made for exposure. | The same: protection under tiles and backfill, and a suitable cap sheet if left exposed. |
| Substrate & moisture | Sound, dry, clean concrete, a bitumen primer and fillets at internal corners. | The same. |
| Repairability | Patched with a compatible sheet after cleaning and priming. | Patched with a compatible sheet after cleaning and priming; compatibility per the manufacturer. |
| Site safety | Hot work: a hot-work permit, a fire watch and extinguishers. | Hot work: the same controls. |
SBS
APP
General educational content; final values and requirements follow the manufacturer’s TDS and the approved project specification.
Service life depends on the product, the build-up, exposure, protection and workmanship — not on the polymer alone. Warranty according to the approved system, manufacturer recommendations and the project agreement.
In both, the cap sheet must be made for exposure (mineral-surfaced or suitably coated). APP usually tolerates heat and UV better, while SBS keeps more flexibility in cold and under movement.
No. Preparation is the same: sound, dry concrete, a bitumen primer, fillets at corners and correct falls on roofs.
Standards that cover these materials — named to show what they cover, not to claim that any product complies.
Technical review
Send the location, area and surface condition, and our engineers will propose the right system after a review.